EBSA

  • Home
  • About Us
  • Products

    GLASS LOUVRES

    Single Glazed

    • G9.5 S / G10 S
    • G11.52 BS / G12 BS / G13.52 BS / G17.52 BS
    • G11.52 FS / G13.52 FS
    • LF550

    Double Glazed

    • BT90
    • MP2 sgi (frameless)
    • MP2 Framed

    Fixed Louvre Brackets

    • EBSA Fixed Louvre Bracket

    Glass Roofs

    • PR60

    Window Automation

    • Natural Ventilation/Smoke Control
  • Services
  • Videos
  • News
  • Contact
  • Home
  • Uncategorized
  • EBSA Release the New MP2 Opposed Opening Louvre at AusFenEx23

EBSA Release the New MP2 Opposed Opening Louvre at AusFenEx23

by virginia / Tuesday, 05 September 2023 / Published in Uncategorized

The Schneider MP2 louvre, initially introduced in 2012, quickly emerged as the preferred choice in the Australian market as thermal performance requirements escalated with updates to the National Construction Code (NCC). Its exceptional features make it a standout solution for contemporary architectural projects.

Already recognised as the top performing louvre on the market, and now we are taking them to the next level with the release of the MP2 Opposed Opening Louvre this week.

The MP2 Series stands out from the crowd, offering unmatched quality and performance. Meticulously designed to integrate seamlessly with sophisticated building architecture and design, these louvres make a bold statement while enhancing the overall aesthetics of any structure.

EBSA – Delivering real commercial solutions
“We make buildings breathe”

  • Tweet

About virginia

What you can read next

MBA ‘Excellence in Construction’ Award Winning Projects Showcase EBSA’s Products
The MP2 Is Unlike Any Other Louvre System You Are Likely To Have Encountered.
EBSA’s MP2 Opposed Opening Louvre Receives the ‘Most Innovative Louvre System 2023’ Award at the APAC Business Awards

Recent Posts

  • The Macquarie University Innovation Hub – Innovative Design and Sustainable Construction

    The Macquarie University Innovation Hub is a st...
  • The Marvel Stadium Upgrade Project Named as a Finalist in the Victorian Architecture Awards

    We are thrilled to see the Marvel Stadium Upgra...
  • Corporate Vision Magazine Features EBSA – Winner of the ‘Best Commercial Window Solutions Company 2025’ at the Australian Enterprise Awards

    EBSA is proud to be recognised as the Best Comm...
  • Globally Recognised Project Features EBSA Louvre System

    Quay Quarter Tower in Sydney has received globa...
  • EBSA Awarded ‘Best Commercial Window Solutions Company 2025’

    EBSA is proud to be named “Best Commercial Wind...

Recent Comments

    Brisbane office
    (Head office)

    Phone

    1300 327 200

    Email

    sales@ebsa.com.au

    Unit 4/209 Leitchs Road,
    Brendale, 4500 QLD,
    Australia

    Melbourne office

    Phone

    1300 327 200

    Email

    sales@ebsa.com.au

    Unit 6/8 Garden Road,
    Clayton VIC 3168

    Sydney office

    Phone

    1300 327 200

    Email

    sales@ebsa.com.au

    Unit 45/7-9 Production Road,
    Taren Point NSW 2229

    EBSA New Zealand

    EBSA Canada

    Maintenance Department

    maintenance@ebsa.com.au

    Our Products

    • G Series
    • BT90
    • MP2
    • LF550
    • Fixed Glass Louvres
    • Ventilation Controllers
    • Smoke Controls
    • Drives
    • Sensors / Switches

    Our Services

    • Design Consultation
    • Design Integration
    • Service and Maintenance

    Follow us

    Latest News

    • The Macquarie University Innovation Hub – Innovative Design and Sustainable Construction

    • The Marvel Stadium Upgrade Project Named as a Finalist in the Victorian Architecture Awards

    • Corporate Vision Magazine Features EBSA – Winner of the ‘Best Commercial Window Solutions Company 2025’ at the Australian Enterprise Awards

    © 2022 EBSA | All Rights Reserved. | Developed by Procloud - Web Design Agency, Signage Brisbane & SEO Agency Brisbane

    EBSA and the EBSA logo are both registered trademarks of EBSA Holdings Pty Ltd

    TOP